Emergency Bridge

The emergency steel bridge is based on the ZB200 bridge with ramps at both ends, so that vehicles and pedestrians can directly drive on the steel bridge, without the need for abutments, but the abutments need to be strengthened. Depending on the field situation, the tray can be one, two, three or four sections.
Product Description

The beauty of our Modular Panel Emergency Bridges lies in their adaptability. These pre-fabricated panels can be swiftly configured to create various bridge types, including single spans, multiple spans, and even temporary suspension bridges. This flexibility ensures that the bridge solution can be tailored to the specific needs of the situation, whether it's a river crossing, a damaged road, or any other scenario requiring immediate access restoration.

Emergency Bridge Application:

● Temporary and Emergency Use

● Heavy Load

● Humanitarian aid and disaster relief operation

● Rural infrastructure project

● Services pipelines

● Construction site access

● Replacement of damaged bridge

● Emergency response stock"

 

Steel Bridge for Emergency Technical Specification

Span

9.144 m (30 ft) up to 60.96 m (200 ft)

(increment of 3.048 m)

Roadway

Width

Single Lane – 4.2m

Double Lane – 7.35m

Material Grade

Steel Grade S460J0, S355Jr

(equal to ASTM Grade 65, 50)

Load Capacity (Option)

10 ~ 50 tons (tracked vehicle), 80 ton (trailer), HA, HB, HS-15, HS-20, HS-25, HL-93, T44….

Surface Protection

Painted or Galvanized

Ramp

3.048m, 6.096m, 9.

Joint System

Pin and Bolt System

Erection

Method

Crane lifting

Cantilever Launching Method

Emergency Bridge Construction

Emergency BridgeEmergency BridgeEmergency Bridge

  • wechat

    Andy: andyxu1110

Chat with Us