Zhenjiang Tongkai Mechanical Engineering Co., Ltd.
The ZB 200 Bridge uses standardized components, or super panel and a selection of decking systems to create a versatile heavy-duty modular steel bridge system with a clear spanning capability of up to 60.96 m (200 ft). The ZB 200 Bridge system combines strong and durable structure with high speed of construction to provide significant advantages over more traditional bridge construction techniques even in the limited access locations such as rural area or disaster stricken area.
Application:
● Permanent or semi-permanent bridging
● Military bridging
● Rural infrastructure project
● Humanitarian aid and disaster relief operation
● Pedestrian bridging
● Services pipelines
● Construction site access
● Replacement of damaged bridge
● Emergency response stock
Span | 9.144 m (30 ft) up to 60.96 m (200 ft),(increment of 3.048 m) |
Roadway Width | Standard Wide – 3.15m;Extra Wide – 4.2m; Double Lane: 7.35m |
Material Grade | S235JR,S355JR,S460J0 |
Load Capacity (Option) | 10 tons, 20 tons, 50 tons (tracked vehicle), 80ton (trailer), HS-15, HS-20, HS-25, HA,HA+HB…. |
Surface Protection | Painted or Galvanized |
Joint System | Pin and Bolt System |
Erection Method | Crane Lifting Cantilever Launching Method |